Global engineering of the automation and low voltage at GSK regarding the RX395 preliminary design study (budget, planning, technical specifications ) for the conversion of the RX46 building into laboratories and storage of samples during the clinical trial phases on an area of 4 floors of 3000m² each (+ technical floors).
Including among others centralized alarm systems, control and protection of clean room and HVAC atmospheres, monitoring of storage in cold areas, washers, incubators, fridges, robots, spectrometers, water bath, centrifuges, fire detection system, electrical distribution, fluid production and distribution loops.
Realized in collaboration with the engineering office RK Tec and PM Group.