GSK / LOC9 transition, Rixensart (2013 / 2014).

Fabricom project manager for the transition of an Archestra supervisor platform and Intouch LOC9.

ArcelorMittal / Welding machine revamping, line 2 Dudelange (2014).

Fabricom project manager for electrical and automation revamping (S7-300/ WinCC) of a welder on a galvanizing line, from basic engineering to commissioning, with ABB ACS800 drives.

ArcelorMittal / Thickeness increase on Mouzon galvanizing line (2014).

Fabricom project manager for the modification of an galvanizing line to increase the maximum strip thickness from 2.5mm to 3.5mm, electrical and automation package (ABB HPCi and S7-400F/ Intouch), from basic engineering to commissioning, including the integration of a new shear and pinch, secure access, replacement of motors and new G120 BS drives (4c), and parameter adjustment of other drives and strip conveying control , modifications to the existing installation and installation of new equipment (€450K).

ArcelorMittal / DRC1 energy recovery system (2013 / 2014).

Fabricom project manager for the electrical management of a system with exchangers for heat recovery.

Electrabel / Engineering, Tihange (2012 / 2014).

Administrative management for services provision.

ArcelorMittal / Drever furnace revamping, galvanizing line Dudelange (2013).

Fabricom project manager for electrical and automation revamping (PLC S7-400 / WinCC) of a Drever furnace on the galvanizing line (line 2), from basic engineering to commissioning, with ABB ACS800 drives.

Drever / J496 galvanizing furnace, Angang (2012 / 2013).

Fabricom project manager for PCS7 automation package for a new Drever furnace in China.

Nexans / Copper refining reliability improvement process, Lens (2012 / 2013).

Fabricom project manager for the enhancement and reliability improvement of a copper refining process (melting furnace and maintaining furnace, and nozzle refining furnace), automation package (S7-300) and instrumentation, from basic engineering to commissioning.

Recent projects
  • Liberty steel group / Entire Pass line revamping and process modification of an electrolytic tinning line (2018 / 2020).
  • Liberty steel group / Automation maintenance on tin-plate coils production lines (2016 / 2020).
  • UCB / New PEG2MAL production (2012 / 2014).