Industry Automation Electricity Process

Automation, electricity and industrial process

  • Home
  • Services
  • Projets
  • Jobs
  • Contact
  • EN
  • FR
  • Home
  • Services
  • Projets
  • Jobs
  • Contact
  • EN
  • FR

Projets

Filtrez les projets et précédentes expériences de Withindustry ci-dessous :

  • Tous
  • Chimie
  • Ponts roulants
  • Energie
  • Traitements thermiques
  • Sécurisation de machines
  • Pharmaceutique
  • Sidérurgie
Lire

GSK Project WN413

GSK Project WN413 new production line into WN17 building (2021).

Lire
Lire

GSK Project for new mobile tanks

GSK Project for new mobile tanks in buildings WN16 and WN30 (2020 / 2021).

Lire
Lire

GSK WN26 new autoclave

GSK Project for the integration of a new autoclave (2020 / 2021).

Lire
Lire

GSK Project WN1808 – WN1911

GSK Project WN1808 – WN1911 for the addition of thawing baths and steam generators (2020 / 2021).

Lire
Lire

GSK Preliminary study project WN359

Reinforcement of the global engineering of the automation and low-voltage team at GSK (2020).

Lire
Lire

GSK RX395 Preliminary study

GSK RX395 Preliminary study Project for Laboratories and Clinical Trial Storage (2020).

Lire
Lire

Electrolytic tinning line revamping

Liberty steel group / Entire Pass line revamping and process modification of an electrolytic tinning line (2018 / 2020).

Lire
Lire

Packaging Tilleur automation support

Liberty steel group / Automation maintenance on packaging production lines (2016 / 2020).

Lire
Lire

Crane P29 Tilleur revamping

ArcelorMittal / Electrical and automation revamping of a 37 tons and 70 tons lifting crane (2018).

Lire
Lire

Automated P6 and P20 cranes

ArcelorMittal / Cranes full automatization on Liège production lines (2017 / 2018).

Lire
Lire

Packaging Liege process tools

ArcelorMittal / Maintenance reliability improvement, electrolytic tinning line 2 Ferblatil (2016 / 2017).

Lire
Lire

New JVD line Kessales

Arceo / New Line, JVD Kessales (2015 / 2016).

Lire
Lire

Ferblatil electrolyte modification

ArcelorMittal / Electrolyte modification on tinning line 2 Ferblatil (2014/2015).

Lire
Lire

Drever J525 furnace

Drever / J525 furnace modification (2014 / 2015).

Lire
Lire

Engineering Tihange

Electrabel / Engineering, Tihange (2012 / 2014).

Lire
Lire

Dudelange Welding machine revamping

ArcelorMittal / Welding machine revamping, line 2 Dudelange (2014).

Lire
Lire

DRC1 energy recovery

ArcelorMittal / DRC1 energy recovery system (2013 / 2014).

Lire
Lire

Thickeness increase Mouzon

ArcelorMittal / Thickeness increase on Mouzon galvanizing line (2014).

Lire
Lire

UCB PEG2MAL production

UCB / New PEG2MAL production (2012 / 2014).

Lire
Lire

GSK LOC9 Rixensart

GSK / LOC9 transition, Rixensart (2013 / 2014).

Lire
Lire

GSK IPV B39.3 Rixensart

GSK / IPV B39.3 transition, Rixensart (2012 / 2014).

Lire
Lire

Copper refining improvement process

Nexans / Copper refining reliability improvement process, Lens (2012 / 2013).

Lire
Lire

GSK Tunnel WN227

GSK / Tunnel WN227 (2012 / 2013).

Lire
Lire

Drever J496 galvanizing furnace

Drever / J496 galvanizing furnace, Angang (2012 / 2013).

Lire
Lire

Dudelange furnace revamping

ArcelorMittal / Drever furnace revamping, galvanizing line Dudelange (2013).

Lire
Lire

Alusi heating modifications

ArcelorMittal / Alusi modification, Florange galvanizing line (2011 / 2012).

Lire
Lire

Tensachem tank alarm system

Tensachem / Implementation of a tank level alarm system (2012).

Lire
Lire

Florange new trimming shears

ArcelorMittal / New trimming shears, Florange pickling line (2010 / 2011).

Lire
Lire

Eurogal Energy optimisation

ArcelorMittal / Energy optimisation, Eurogal line (2010).

Lire
Lire

GSK RX182 polio vaccine

GSK / RX182 polio vaccine production (2009 / 2010).

Lire
Lire

TLB furnace loading revamping

ArcelorMittal / Furnace loading revamping, Chertal (2010).

Lire
Lire

GSK RX181 whooping cough vaccine

GSK / RX181 whooping cough vaccine production (2008 / 2009).

Lire
Lire

Electrabel new steam turbine

Electrabel / New steam turbine, Tihange 2 (2009).

Lire
Lire

UCB Alspa project

UCB / Alspa project (2007 / 2008).

Lire
Lire

Dudelange furnace revamping (basics)

ArcelorMittal / Drever furnace revamping, Dudelange galvanizing line (2008).

Lire
Lire

Florange galva regenerative burners

ArcelorMittal / Regenerative burners, Florange galvanizing furnace (2007/2008).

Lire
Lire

Florange galva furnace revamping

ArcelorMittal / Revamping, Florange galvanizing furnace (2006 / 2007).

Lire
Lire

Ferblatil new entry pickling line

ArcelorMittal / New entry, Ferblatil pickling line (2006).

Lire

Head Office : Withindustry sprl, rue Froide Fontaine n°2a, 4577 Outrelouxhe, BELGIUM VAT : BE0603.998.313