ArcelorMittal / Drever furnace revamping, Dudelange galvanizing line (2008).
Management of the technical study phase for Fabricom supply of electrical and automation revamping (PLC S5 -> S7-400 transition) of a Drever furnace on a galvanizing line (line 2).