GSK Project WN413
GSK Project WN413 new production line into WN17 building (2021).
LireFiltrez les projets et précédentes expériences de Withindustry ci-dessous :
GSK Project for new mobile tanks in buildings WN16 and WN30 (2020 / 2021).
LireGSK Project WN1808 – WN1911 for the addition of thawing baths and steam generators (2020 / 2021).
LireReinforcement of the global engineering of the automation and low-voltage team at GSK (2020).
LireGSK RX395 Preliminary study Project for Laboratories and Clinical Trial Storage (2020).
LireLiberty steel group / Entire Pass line revamping and process modification of an electrolytic tinning line (2018 / 2020).
LireLiberty steel group / Automation maintenance on packaging production lines (2016 / 2020).
LireArcelorMittal / Electrical and automation revamping of a 37 tons and 70 tons lifting crane (2018).
LireArcelorMittal / Cranes full automatization on Liège production lines (2017 / 2018).
LireArcelorMittal / Maintenance reliability improvement, electrolytic tinning line 2 Ferblatil (2016 / 2017).
LireArcelorMittal / Electrolyte modification on tinning line 2 Ferblatil (2014/2015).
LireArcelorMittal / Welding machine revamping, line 2 Dudelange (2014).
LireArcelorMittal / Thickeness increase on Mouzon galvanizing line (2014).
LireNexans / Copper refining reliability improvement process, Lens (2012 / 2013).
LireArcelorMittal / Drever furnace revamping, galvanizing line Dudelange (2013).
LireArcelorMittal / Alusi modification, Florange galvanizing line (2011 / 2012).
LireArcelorMittal / New trimming shears, Florange pickling line (2010 / 2011).
LireArcelorMittal / Drever furnace revamping, Dudelange galvanizing line (2008).
LireArcelorMittal / Regenerative burners, Florange galvanizing furnace (2007/2008).
LireArcelorMittal / Revamping, Florange galvanizing furnace (2006 / 2007).
Lire